Standardized Work (STW) is finding the best-practice method of doing work (individual job, jobs in a cell, jobs in a value stream), having everyone doing these jobs doing them in the same standard way (taking the variability out of the person-to-person aspect of each job) and continuously improving these jobs (to improve performance)
Learning Objectives:
1. Purpose of STW is to eliminate operator-to-operator variability and follow “one best practice” way of doing each job
2. Difference between STW and Work Standards
3. The 3 major elements of STW (standard method, standard cycle time, standard inventory)
4. Balancing the Line with STW
5. Applying STW to Each of the Value Streams
6. STW Checklist
7. STW Radar Chart
8. STW Kaizens (to be put on 90-day Kaizens)
Who Should Attend:
Duration: 2 Days
JCM Work Designs/The Lean Sigma Team can design and conduct this workshop to meet your specific needs. Please contact us for a formal proposal.